            Master Plan for Elementary School Facilities in Concord
                                    Updated December 2008
 
1.0 Background: Why a Master Plan for Elementary Schools?
 
1.1 School Board Identifies Need for Master Plan for Elementary Schools
 
At their annual retreat in the winter of the 2002-2003 school year, the School Board identified the need for a long range plan for the elementary school buildings in the school district. Many of the facilities were very old, built in the early 1900s. The buildings were not handicapped accessible and had poor heating and ventilation systems. The elementary school population had declined significantly since 1997 when the sixth grades were moved from the elementary schools to the middle school. For example Conant School in the South End of Concord had 500 students in 1997; today it has closer to 350 students. Four schools, Dewey, Rumford and Eastman had fewer than 175 students in attendance.
 
Reacting to the declining enrollments in one sector of the city, in the spring of the 2002-2003 school year the Concord Superintendent of Schools recommended that the students scheduled to attend Dewey School in the Fall of 2003 attend Kimball School instead. Kimball School had sufficient space and the Kimball administrator and many staff voiced their concerns about the increasing fragmentation of the program at Dewey School given that no one except 2 kindergarten teachers and 2 first grade teachers worked full time in the building. The principal reported that nearly 20 different individuals were in and out of the school each week. The Dewey School was temporarily closed for the 2003-2004 school year.
 
The community surrounding Dewey School was upset about this decision. They felt that a decision about the future of a school shouldnot be made until the School Board had a comprehensive plan for all the elementary schools. Members of the Dewey Kimball community offered to participate in the development of such plan.
 
1.2 Preparations for a Master Plan
The School Board and administration met with a variety of individuals during the 2002-2003 school year including the city’s master planning team, the Executive Director of the Superintendents’ Association and the consultant for educational facilities at the New Hampshire Department of Education. The Board sought guidance from each of these parties in the development of a master plan.
 
In the winter of the 2003-2004 school year, the School Board issued a Request for Proposals for a consultant who could assist the district with the task of developing a master plan for the elementary school facilities. The district had presentations by representatives of the three consulting firms who responded to the request. The district selected the architectural firm of Dore and Whittier to conduct a study of all the elementary facilities in the district and to work with a citizens’ advisory committee to determine the community values and priorities for the elementary facilities. The Board charged the consultant and advisory committee with developing recommendations to be made to the School Board’s Capital Facilities Committee. The Board was interested in alternatives that effectively and efficiently use the existing facilities, modify or renovate existing facilities or develop new facilities. The master facilities plan for the elementary schools would eventually be used to make decisions about renovations, additions, reconfigurations of existing facilities, attendance boundary lines, transportation policy, etc. for the next decade.
 
2.0 Enrollment status and projections
 
Enrollment is a key parameter that affects the number and size of elementary schools in Concord. The School Board’s study coincided with the city government’s review and revision of its master plan so the school district was able to take advantage of a major study of future growth and change in Concord by Planning Designs, Inc. from South Portland, Maine. 
 
2.1 City Population Growth
The city study reported that Concord’s population growth had fluctuated from moderate to rapid in the past 50 years. From 1950 to 1980 the city expanded by fewer than 2,500 people. Between 1980 and 2000 the city’s population grew by more than 25% or 10,000 residents. This recent growth reflected the growth in Merrimack County and the state of New Hampshire.
 
Concord’s population growth has not been consistent across the city – the denser urban areas grew very little in the last two decades while outlying areas grew significantly. While the population has grown, the average household sizes have steadily decreased from 2.48 persons per household in 1980 to 2.29 persons per household in 2000. These decreasing household sizes follow national trends towards smaller households due to longer life expectancies, more single-parent and one-person households, younger couples postponing childbearing, and fewer children in each family than a decade ago.
 
Concord residents are growing older as the median age increased from 30.0 years in 1980 to 37.0 in 2000. The aging of the baby boom generation, coupled with lower birth rates among younger couples and increased life expectancies combine to increase median ages. As a result of the aging population, the number of fertile females (those between 18 and 44) is decreasing. In the last 15 years, the number of births to Concord residents has decreased from 550 and 600 per year to between 450 and 500 per year. The city’s consultant noted, “This could have an impact on the number of children enrolled in the school system…”
 
Planning Decisions, Inc. projects Concord’s household population will reach 43,107 by 2015 and Concord’s population is projected to reach 48,052 by 2030. This projection was based on trends in the city’s demographics and residential construction rate. The average household is projected to decrease to 2.27 persons by 2015 and to 2.23 persons by 2030.
 
Planning Decisions, Inc. reported that Concord residents between 5 and 17 years of age grew by 26% between 1980 and 2000, the majority of this increase in the 1990s. At the same time, however, the population of fertile females has been decreasing.
2.2 School Enrollment
The increase in the total enrollment in the school district between 1994-95 and 2003-04 hides the more subtle changes in the grade-group data. An increase in grades 9 – 12 was offset by a decrease in grades K – 5. This suggests that, as these younger class sizes move through the school district, class sizes in the upper grades will eventually decrease.
 
Elementary and high school enrollments have recently reached their all-time high. Elementary and high school enrollment declined from 6,249 in 1970 to 5,180 in 1980. By 1990 enrollments had increased slightly to 5,328 students. By 2000, elementary and high school enrollment increased significantly, reaching 6,825 students, a level of enrollment which is higher than what occurred in 1970
 
In the first five years of the period, 1994-95 through 1998-99, K-5 enrollment averaged 2,588 students. By the second five years of the period, 1999-00 through 2003-04, average enrollment declined by 200 students, to average 2,388 students.
 
When looking at 9-12 enrollment, Concord School District’s enrollment averaged 1,404 students between 1994-95 and 1998-99, but then increased by 225 students, to average 1,629 students between 1999-00 and 2003-04. Therefore, while total K-12 enrollment increased slightly, on average, an increase in 9-12 enrollment was mostly offset by a decline in K-5 enrollment. It is important to note that the larger class sizes in grades 9-12 will eventually decline as the smaller class sizes seen in grades K-5 move through the school system.
 
2.3 School Enrollment Projections, 2014
Concord's school enrollments are projected to decrease steadily between 2004 and 2014. Enrollments in the Concord School Department reached their all-time high around 5,500 students in ‘98-‘99. The population has since declined to 5,191 today. School enrollments are projected to continue decreasing through 2014 when they reach 4,625 students.
 
Two major trends explain these decreasing enrollments. First, there are fewer women of child-bearing age in the city's population. The last of the Baby Boom generation (those born between 1945 and 1965) are now reaching 40 years of age. As these Boomers leave their prime child-bearing years behind, not as many parents are replacing them. This pool of parents in their prime child-bearing years has been steadily decreasing steadily for a decade.
 
The second trend suppressing enrollments is the decrease in the Concord School District Projection, K-12, average size of families. This decrease is the result of several factors, including parents waiting longer to have children and having fewer children once they do decide to start a family.
 
The result of these two trends has been a marked decrease in the number of births to Concord residents. In the last ten years, the number of births to Concord residents has decreased from between 550 and 600 per year to between 450 and 500 per year. Declines are projected in all grade categories, but declines in the high school population are projected to be the most dramatic. Between 03-04 and 13-14, high school enrollments are projected to decrease from 1,675 to 1,371 students.
 
 
School district enrollments by decade
1965………………….. 2,907 students
1975……………………2,352 students
1985……………………2,292 students
1995……………………3,035 students
2000……………………2,498 students (6th grade students move to Rundlett)
2005……………………2,210 studnets (800 fewer students: 400 to Rundlett, loss of 400)
 
Building enrollment (maximum)                                Today… (9/11/07)
 
Beaver Meadow … 657 students                                   407                                                  
Broken Ground …. 427 students                                   377
Conant …………… 578 students                                   363
Dame……………... 583 students                                   247
Dewey……………. 178 students                                   -
Eastman………….. 241 students                                   115
Kimball ………….. 347 students                                   303
Rumford …………   367 students                                138
Walker …………..   453 students                                 159
 
 
2.4 Effects of Enrollment Decline
As size of school declines, so does the program. Schools less than 400-500 do not have a full time faculty nor can they have a complete program.
 
School populations can decline too much – and lead to more limited opportunities for students, teachers and parents. Ten years ago Walker School had 453 students….with full time art, music, physical education teacher; a full time nurse and guidance counselor. Today Walker School has 165 students, shares a nurse and guidance counselor with Rumford School. “Specials” teachers are assigned to teach classes at more than one school; during           the week they travel from school to school.
 
There are not enough students in any one of our elementary schools to justify full time art, music, instrumental music, literacy arts and health and physical education teachers. We have “traveling” teachers who teach the arts or physical education in two or three or four different elementary schools each week.
 
  • This model has a huge impact on the kind of program that can be offered in the school. Without full time Art or Music teacher, it becomes difficult to have an arts program that includes special performances, extra curricular activities in the arts and most importantly, connections and collaboration with classroom teachers. Children need to be able to see the connections between the arts and literature and history, music and math, science and physical education.
 
·        Most schools do not have a full time guidance counselor or full time nurse.
 
·        Special education coordinators travel from elementary school to elementary school during the course of a day or week.
 
·        Other specialists – psychologists, counselors, OT and PT teachers – also travel from school to school each week, working two children in this school, five children in that school. They come and go with little time for consultation with the child’s classroom teacher, little time to plan lessons and services together.
 
·        In the past one of our principals traveled across the city each day as she administers to two different schools.
 
The instructional program suffers in these shrinking schools.  The program can become fragmented and inflexible.
 
·        It is difficult to maintain uninterrupted time for instruction when the class schedule must accommodate the tight schedules of itinerant teachers and specialists.

·        “Traveling” teachers are not well integrated into the life of a school. Traveling from school to school makes it difficult to provide special performances, extra programs after school or extra help from a “traveling” teacher.
 
Shrinking schools mean split classes.
 
·        There may not be a sufficient number of children at a grade level to create two classes so we use a “split class” model. The class is made up of twelve 3rd graders and ten 4th graders.

Shrinking schools make it difficult to place children in different classrooms at a grade level.
 
·        As the enrollment in our schools declines, we have fewer classes at each grade level. At one school this year there is only a single class at every grade. There is no option in this school to separate children into different classes or to match children with differing teaching styles.

It is the administration’s recommendation that we consider schools in the range of 450 to 500. These schools would enable us to have at least 80 students per grade or 4 classes, allowing flexibility for student placement and teacher assignments. This number of classes should decrease the need for “split” classes for enrollment purposes only.
 
Shrinking schools have fewer options for placement in classes for both students and teachers.
    
·        A shrinking school may have only one or two classes at a grade level. This limits the flexibility of placing students with certain teachers or not with particular children.
 
One or two classes at a grade level means very limited opportunities for teachers to collaborate with other teachers at the same grade level. 
 
·        New teachers who are the only teacher of their grade in the school have no one to go to for help with curriculum, materials, advice about handling certain challenges.
 
 
 
3.0 Architectural Study of Elementary School Facilities
During the spring of 2004, the architectural firm of Dore and Whittier conducted a study that included a thorough architectural and engineering review and assessment of all nine buildings and sites, a review of enrollment projections as well as the development of an educational program and a series of alternatives for the long range educational plan for the district.  
 
During the architectural study of buildings a general review of current building codes was performed, however, structural calculations were not performed to determine capacities of structural conditions or evaluate if they meet current code requirements.
 
The architectural team also reviewed prior studies of district schools including the , following:
 
  • Architectural study of six Concord schools, CMK Architects, 1990
  • Concord Elementary Schools study, Banwell White Arnold Hemberger and Partners (BWAH&P), September 1993
  • Handicapped Accessibility Study, BWAH&P, October 2001
  • Capital Improvements to Roofs, Independent Roof Services, Inc. October 26, 2001
  • Primex Playground Equipment Safety Inspection Report, June 2, 2003
  • School
  • School District 5 and 10 year Maintenance Reports
 
3.1 Architectural Study Findings
The architectural team visited the nine elementary school buildings and saw aging and outdated schools, inaccessible, did not meet current codes or standards, without HVAC, inefficient, in need major repairs such as up to date electrical systems.
 
(Timeline)
            Oldest is Dewey, originally constructed 1890; additions, modifications 1956-58
            Next is Rumford 1902, addition in 1952
            Kimball, 1906 (originally high school)
            Walker 1910
 
            In 1902, there were 31 schools in Concord and Penacook
 
            Dame 1923, additions 1941, 1960-65
            Conant 1929, changes 1948, 1961, 1967, 1985, 1998
            Eastman 1935, addition 1958
                       
            Broken Ground 1973, addition 1988
            Beaver Meadow, 1987, addition …
 
Inaccesible
 
A child with physical disabilities cannot go to his neighborhood school with his brothers and sisters or next door neighbors if he lives in the neighborhood of Kimball School, Walker School, Rumford School, Eastman School or Dewey School.
 
Inefficiencies
 
The district pays $.95 per square foot for steam heat at Concord High School and $3.06 for steam heat at Kimball School and the administrative building.
 
The district pays $.58 per square foot for oil heat at Beaver Meadow School and $ 1.79 per square foot for oil heat at Eastman School.
 
Inequitable and inadequate
 
Students at Broken Ground School have a full sized gymnasium for physical education classes, whole school meetings, performances and community activities such as East Side basketball leagues
Dame School has no gymnasium. The students at Dame School must leave class, put on their coats, leave school, load the bus and travel to Broken Ground School for what should be a 45 minute physical education class.
 
Conant School has a recently renovated library in the center of their school. The library at Rumford School is in a former classroom in the basement of the building.  
 
Students at Beaver Meadow school has rooms dedicated for Art and Music and have bathrooms in their classrooms and plenty of room to store their projects. The art teacher at Rumford School must set tables and assemble materials in the multipurpose room for each class and Rumford students travel down one or two flights of stairs to the two sets of bathrooms in the basement of the school
 
Summary of Facility Deficiencies
 
Sites: For schools to remain in neighborhood areas there is a need for:
  • improvements to circulation of vehicles and pedestrians
  • separate drop off areas for busses and parents
  • a sufficient number of parking spaces
  • adequate playing fields and playgrounds 
 
Architectural: Top concerns identified in the Dore and Whittier study:
  • Buildings that do not meet the current building and life safety codes.
  • Lack of adequate ventilation
  • Aging heating systems
  • Means-of-egress conditions?
  • Lack of smoke and fire rated partitions
  • Barriers to handicapped accessibility
  • Inadequate core facilities
  • Limited space for educational support programs
  • Significant inequity among elementary schools
 
Mechanical systems:
  • Obsolete mechanical systems
  • Inadequate air exchange
  • Lack of any centralized control system for school’s plant equipment
  • Inefficient energy consumption
 
Plumbing systems:
  • Fixtures not in compliance with ADA requirements
  • Condition of sub-slab drainage piping in 6 schools constructed before 1930
  • Roofing systems that do not meet current plumbing codes (secondary roof drain on flat roofs)
 
Fire Protection systems:
  • Compromises in building envelope insulation or air barrier that may cause frozen pipes and structural damage
 
Electrical systems
  • Limited surge protection
  • Little or no phase loss protection equipment
  • Structures that do not take roof mounted lightning protection systems
  • Limited security alarm systems and other security monitoring systems
  • No centralized HVAC control systems
  • No centralized maintenance systems
  • No central exterior and security lighting and control systems
  • Lack of energy conservation devices such as occupancy sensor lighting controls
  • Major power and wiring upgrades needed for modern equipment
  • No standby emergency generator power
 
4.0. Community Advisory Committee Formed
During this same period of time, the Community Advisory Committee was formed. A list of members is included as Appendix A.
 
The Advisory Committee met for a period of months to discuss the future of the elementary schools in Concord. Frank Locher, a consultant brought in by the Dore and Whittier team, worked with the advisory committee to plan two community meetings to assess the community’s values and priorities for its elementary schools. The advisory committee’s tasks included providing the consultant with general information and perceptions of Concord and its schools; providing the consultant with information about how the current facilities have worked and were working in the school district; assisting the consultant with plans for two public meetings between March 2004 and June 2004; synthesizing what was voiced at the public meetings; hearing the consultant’s potential alternatives for the elementary facilities; identifying the strengths and weaknesses of the different alternatives and making a report to the Capital Facilities Committee of the School Board.
 
In addition to the two public hearings the Advisory Committee conducted an online survey for the public to weigh in on their goals and priorities for the elementary schools in Concord.
 
The Community Advisory Committee reported to the Capital Facilities Committee in July 2004. Their report included a number of alternatives for renovating, replacing or closing the elementary schools in Concord.
 
5.0 School Board Capital Facilities Committee Activities
In the fall of 2004, the Capital Facilities Committee reviewed the findings for each of the elementary schools and met with the principal of each of the elementary schools to hear about the strengths and needs of each facility. During the 2004-2005 school year the Superintendent and Director of Facilities met with parents at each of the elementary schools to explain the results of the architectural study and advisory committee’s alternatives and gather community feedback on the various alternative plans. The School Board Joint City Council School Board Committee received periodic updates from city planners on the potential growth in the city.
 
The Capital Facilities Committee also met with various groups from the city, including representatives of 20/20 to discuss ways in which the two groups could work together.
 
5.1  Major Principles for the Master Plan
In the fall of 2005 the Capital Facilities Committee developed a set of major principles and priorities for the elementary schools. These included:
 
  • Neighborhood Schools
The strong priority in Concord is to maintain a system of neighborhood elementary schools.
 
  • School Size
School size was the topic most discussed during the Facilities Committee work. The research on the impact of school size of student achievement is very mixed.
The Capital Facilities Committee concluded from its review of the literature and research that we should plan for schools between 300 and 600 students. These schools would enable us to have multiple classes per grade allowing flexibility for student placement and teacher assignments. This number of classes should decrease the need for “split” classes for enrollment purposes only.
 
Schools in this student range will support full time staff. The increasing complexity of the elementary school program and increasing demands for maximizing instructional time make this factor very important. Full time specialists in a school will enable the staff to better integrate the arts and physical education programs with the rest of the educational program. Full time specialists enable schools to build stronger art and music programs over time.
 
  • Grade Span
Research on the optimal grade configuration is mixed. The committee’s goal was to minimize transitions in the configuration to the maximum extent possible.
 
  • Class Size Guidelines
Class size determines the number of classrooms needed in an elementary facility. Throughout this planning process, parents have consistently voiced their preference for small class sizes.    It was the administration’s recommendation that facilities be designed based on a class size average of 20 students per class.
 
  • Safety
It is a priority that the school district improve the security of our schools while maintaining a welcoming place for parents and community. Safety at and around the sites for our schools must also be a priority. 
 
  • Accessibility
The Capital Facilities Committee was committed to build and renovate facilities that support the philosophy of full inclusion of all students, including students with special needs. We also want all members of the community to be able to access all areas of our school buildings.
 
  • Environmental considerations
The Facilities Committee supports the concept of building high performing schools and recommends further study of high performing schools.
 
  • Flexible space
Future programming at the elementary level will require flexible instructional spaces. Students must be able to work independently, in small groups as well as in large groups.
 
  • Kindergarten
There is strong research that full day kindergarten can have positive effects on student achievement. The Facilities Committee recommends that the educational specifications for our elementary schools include planning for full day kindergarten with the recognition that there are significant costs involved in implementing full day kindergarten. The actual implementation of a full day program must be a future budget decision.
 
  • Preschool programs
There is also strong research that preschool programming can have positive effects on student achievement. The Facilities Committee recommends that the educational specifications for our elementary schools include planning for preschool programming with the recognition that there are significant costs involved in expanding preschool programs.. The actual implementation of preschool programs must be a future budget decision.
 
  • Community Use
Planning for future school facilities should recognize the changing patterns in our national demographics: increase in retirement aged people; fewer residents with children in schools; residents with concerns about health care and adult recreation; residents with concerns about increasing taxes; and a more diverse school aged population. The Facilities Committee recommends that the Concord School Board adopt a goal that our schools become centers for community activities.
 
5.2 Cluster Plan for Elementary Schools
At the end of the 2005-2006 school year, the Capital Facilities Committee asked the administration to develop a set of recommendations for the future configuration of our elementary schools. In September, 2006 the Superintendent presented a “concept paper” introducing the proposal that the district organize students into four “clusters” in the city. The term “cluster” refers to the distribution of students throughout the city. The Committee elected to use the word, “campus” to describe the location of schools in the city.
 
The plan called for four campuses.
 
  • Beaver Meadow would continue as the campus for the cluster of students currently attending Beaver Meadow School. Beaver Meadow has a capacity for 550 students.
 
  • The second cluster would be a downtown cluster. This cluster would consist of students currently attending Walker School and Kimball Schools. The recommendation is to rebuild one school for 450 – 500 students at the Kimball School/Central Office site.
 
  • The third cluster of students currently attending Rumford School and Conant School in the South End of Concord would attend a renovated or rebuilt school for on the current site of Conant School.
 
  • The East Side/Heights cluster consists of students currently attending Eastman School or Dame School for grades pre-K through 2 and Broken Ground School for grades 3 through 5.. The Broken Ground site would become the campus for this cluster of students with two schools. A new school would serve the primary level students.
 
 
Location of four campuses of the future:
 

Campus at Conant site
Campus at Beaver Meadow site
Campus at Broken Ground site
Campus at Kimball site

         
 
5.3. Community Feedback on Cluster Plan
The Capital Facilities Committee conducted a “listening session” at Dame School in October to hear community reaction and response to the Superintendent’s proposed four cluster plan. In December 2006 the Capital Facilities Committee recommended to the full School Board that the Board direct the Superintendent and administration to continue to develop the four cluster plan. This recommendation passed unanimously at the December School Board meeting.
 
Presentations
Between December 2006 and April 2007, the Chair of the Capital Facilities Committee and the Superintendent of Schools held informational meetings at all but Broken Ground School. The team also made presentations to the Joint City Council School Board Committee, Rotary, Kiwanis, the 20/20 Board of Directors. The Capital Facilities Committee also met with a consultant, David Provan, who provided the committee with information about gaining community consensus around a facilities plan.

Community Meetings
On May 21 and May 23, 2007, the Board hosted two community meetings to hear community comment on the proposed four campus plan. Approximately 60 citizens attended the first session and close to 80 attended the second sessions. Participants were able to view maps of the four clusters, review the current distribution of children throughout the city, view slides depicting physical problems in the different elementary schools; talk with district staff including elementary principals and specialists about the challenges of scheduling and providing a full program in our small schools. Participants were also able to talk with Kirk Stone and Dick Henry, from the Jordan Institute, about “high performance schools.”
 
The feedback heard at the community meetings was mixed. A number of citizens thanked the Board for taking on this challenging task and endorsed the Board’s plans to consolidate into four campuses. Others questioned whether the Board had already made a final decision and would not respond to community input. The major issues raised at these sessions were for more information regarding the Board’s design for new elementary schools and the costs for this major project for taxpayers.
 
During the summer of 2007 the School Board endorsed the concept of consolidation among elementary schools and asked the administration to continue to develop the cluster plan. The Board also authorized three task forces to address questions raised by the community. The questions included: What will be the improvements to the educational program for our children? What will the master plan cost to implement? What will happen to the old buildings if they are no longer used for schools?
 
Community members and professional staff were invited to participate in the Task Forces. The first Task Force on Educational Specifications met from November through March and has produced a draft of general educational specifications that should be met in any new or renovated elementary school in Concord.
 
In April 2008, the second Task Force was organized. This is the Task Force on Costs. The list of members serving of this Task Force is found in Appendix __.
 
The Task Force on Costs has met twice. At the first meeting the group agreed to begin the work by studying two schools – Kimball and Conant and determine what can be done to get “new” schools on these sites – comparing the costs of building or renovating buildings for 300 students and for 500 students. This agreement to evaluate these two sites for 300 students as the master plan would call for schools of 400 – 500 (without preschool) is a compromise agreed to by the Task Force members, some of whom are not in favor of the four cluster plan. 
 
The first task for the architectural consultant at this stage of the project was to work with this Task Force (about 20 people, including community, Board members and currently led by the Superintendent and new Director of Facilities and Planning) to determine what can be done on the Kimball site and the Conant site to have good schools at these locations and how much it will cost to renovate or build new (or some combination) these schools.  The following conclusions can be drawn from Task Force II work:
 
Task Force II has met regularly since April 2007. Over the summer, the Task Force went on a field trip to Laconia School District to view construction of a new building and a completed elementary school renovation. It also hosted a variety of guest speakers on topics ranging from available state funding amounts for schools to energy conservation and “green” building methods. The Concord teachers and other members of Task Force I presented the Educational Specifications for Concord Schools. Additionally, the Task Force toured district facilities.
The Task Force met with Concord teachers where issues of equity among Concord elementary schools and surrounding New Hampshire communities were discussed. The strategies teachers use to compensate for deficiencies in their schools were discussed at length, as was the limited amount of technology in the classrooms due to lack of electrical capacity or space.
 
The Task Force learned about state funding and the fact that Concord Schools are eligible for 40% state building aid, and an additional 3% in “Green” building technology. The Jordan Institute conducted a “portfolio manager” analysis to evaluate the Energy Star rating of Conant and Kimball schools. Conant scored 41% efficiency, and Kimball 9% efficiency. “Green” buildings or Energy Star-rated buildings typically score 75% or higher.
 
Charge:
 
The first meeting of Task Force II was spent in a vigorous discussion of the composition of the Task Force and the purpose of the Task Force. The group agreed that it would conduct the feasibility study by looking at two specific sites, Kimball and Conant, and consider and compare the costs of renovating or building new schools on these sites to house both 300 and 500 students.
 
Task Force II Outcomes
 
Members of Task Force II have listened, discussed, debated and weighed in on a number of issues related to the proposed elementary facilities master plan. Following is a summary of their perspectives on a variety of important issues.
 
1. Do we renovate or do we build new?
 
In an earlier study in 2004, the Dore and Whittier architects evaluated each of the sites of the current elementary school and each of the elementary school buildings for the potential to renovate and build new. At that time there was some evidence that building new schools was going to be as or more cost effective than trying to renovate the existing 100 year old schools.
 
This Fall, 2008 Harriman Associates architects and engineers evaluated the sites and buildings and reported to the Task Force that they felt the two schools were good candidates for renovation and has developed preliminary sketches of a facility to house 500 students on the Kimball site. Kimball itself would be renovated; an addition would be added with many of the core facilities such as a library and gymnasium.
 
Advantages
In this plan, Kimball would be a downtown elementary school – a goal of the many who have participated in this process. Kimball is a historic building as it was originally the high school building in the early 1900s. Kimball is in a walkable area.
 
Dan Cecil of Harriman Associates called Kimball a potential educational “gem.” The arrangement of classrooms around a common area is a very modern plan that provides space for individual as well as small group and large group work.
 
Renovating and adding to Kimball would make Kimball handicapped-accessible and improve energy efficiency – a significant financial consideration. . The project at Kimball would increase the equity of opportunity among the elementary schools.
 
Disadvantages and concerns
Renovating and adding to Kimball is likely to cost $20million plus. Kimball School is in a congested site and the Task Force members worried about traffic and parking issues. Members suggested looking at the design if it is for 350 children..
 
A project at Kimball would require the Central Office organization to be relocated perhaps to Dewey.
 
There is limited lot area at the Kimball site, even with the purchases of adjacent properties. The early designs for Kimball appeared very large with inefficient spaces. There is limited playground space as well.
 
The Kimball facility will have limited ability to go beyond 500 students in the future. If Walker School is closed, the district has not increased capacity within the school district.
 
2. Do we renovate or replace the Morrill Building as part of Kimball project?
 
The architects developed two alternative plans for Kimball, one which tries to use the Morrill building and one that does not.  The Task Force talked about the pro’s and con’s of keeping Morrill.
 
Advantages
The appearance of Morrill is consistent with Kimball, built by the same architect. Maintaining Morrill is potentially less controversial to the public and historic preservation community. Maintaining Morrill would lessen the disruption to the character of the neighborhood as its scale is appropriate to the site. In addition, there would not be demolition costs or costs associated with hazardous materials.
 
Disadvantages and Concern
The most challenging aspect of maintaining Morrill is the fact that the levels of the two buildings do not match. An elevator that opens on both sides and make ten different stops would be necessary. 
 
Using Morrill limits the creative and efficient design. The Morrill building has restricted dimensions with limited core mechanical elements. The paybacks on a system designed for Morrill may not be as large as paybacks on a new facility. There is a lack of information about the building’s structure as the original construction plans have not been located. The structural integrity of the building is unknown at this time and there is concern that adding mechanical penetrations and doorways to Morrill would threaten its structural integrity. There is also concern about potentially hazardous materials that are used in the building.
 
3. Do we use the house lots along Pleasant Street as part of the Kimball project?
 
a.Use house lots on Pleasant Street as part of the project
 
The architects felt that in order to maintain a neighborhood school downtown for 500 students it is necessary to use the house lots along Pleasant Street. 
 
Advantages
 
Preliminary plans have play space (“green space”) in this area. It also provides land for additional parking. An access way to Pleasant Street may provide a lane for cars and/.or buses. The apartment buildings on the corner of Rumford and Pleasant are in very poor shape. There is more traffic control with an internal drive that exits onto Pleasant Street. The purchase of the house lots is eligible for reimbursement at 40%.
 
Disadvantages and concerns
Using the house lots on Pleasant Street changes the streetscape and removes property that could be renovated for housing. It would leave the landscape to a more suburban look. The apartment buildings provided affordable rental housing near downtown.. Using the house lots means losing seven 100 year old buildings – an historical loss. There will be significant disposal costs if the properties are taken down.
 
An exit onto Pleasant Street may cause traffic congestion on Pleasant Street
 
Using the house lots means a loss of tax base and revenues to the city.
 
4. Should we renovate or build new at the Conant School site?
 
The architects’ assessment of Conant School was that it had great potential for renovation with an addition.
 
Advantages
Renovating and building an addition at Conant enables the community to ,maintain a neighborhood school Conant School is a 1935 building with historical significance. There is plenty of land and room for expansion if necessary.
 
A renovation and addition at Conant would enable to the district to achieve savings in energy use.   The proposed addition would connect the gym to the rest of building. In addition, the current gym building has no insulation and is very inefficient.
 
Disadvantages and concerns
Members of the Task Force worried about the wisdom of investing $10 million in a 1935 building. Conant has no basement and there is some concern about moisture and mold.
 
A project at Conant would increase traffic and potentially fewer students would walk to school. Potentially busing costs could increase.
 
If Rumford School is closed, there is no increase in student capacity for the school district. Because of the concerns about future enrollments, the district should consider moth balling the Rumford for a period of time in case it is needed in the future.
 
5. Should we strive to renovate the buildings with additions to be “green” schools?
 
Advantages
Building green schools is the responsible thing to do. Decreasing our reliance on fossil fuels provides a good model for our children. We would be conserving natural resources while creating healthy buildings for staff and students. This would benefit the educational performance of students as well as provide physical benefits.
 
Green schools have long range operational savings. There is an addition 3% building aid from the state available. Utility rebates are available to help decrease cost and many systems have reasonable paybacks. Having energy efficient buildings is essential given the dramatic increases in energy costs in the future.
 
Contractors now have increased expertise to build green buildings and the service market is better developed.
 
Disadvantages and concerns
Building green schools will have higher up front costs. It may be difficult to do in a renovation project compared to building new. We should make a serious effort at Conant and Kimball to design energy efficient buildings, balanced with an eye toward budget. A future school upgrade at one of the other campuses will afford a “ground up” opportunity for a LEED/CHIPS certification. It should be easier to design a green building from the ground up
 
Maintaining a sophisticated system requires a higher level of expertise for staff. This could limit who works on the controls. It may be difficult to hire and retain qualified instrument and controls technicians. Constructing a green building will require careful monitoring and careful commissioning.
 
Our existing buildings could be made greener.
 
6. Should we do nothing?
 
If we do nothing, there will be no bond issues, resulting in short term savings to our taxpayers. Doing nothing means small neighborhood schools remain preserving space for future population growth. The historic buildings remain as is. Doing nothing means there is no disruption to students during construction.
 
There is no crisis right now so doing nothing would provide time to coordinate with the city and its capital projects. It also provides time to evaluate future population growth. Given the economic crisis in the country, doing nothing avoids any big ticket projects right now. It will also lessen pressure for the city council to take over the school budget.
 
Disadvantages and concerns
Doing nothing means the problems of small schools (education, accessibility, equity) remain. In fact inequities may increase with the aging of these buildings.  
 
Poor internal environmental conditions remain – poor air quality, possible PCBs, accessibility issues, existence of hazardous materials, affecting the health and safety of our children.
 
Given the inefficient buildings, the district faces increased costs for heat and maintenance. There will be higher operations and maintenance costs in the future. Major maintenance repairs will be needed to be done at a higher cost. Investing in short term upgrades in these old building is questionable.
 
Right now the market is competitive. Doing nothing means losing the opportunity for 40% state building aid.
 
Doing nothing means foregoing the opportunity to put some properties, the surplus schools, back on the rolls.
 
7. Should we have equity among the elementary schools?
 
Advantages
Achieving equity among the schools would enable the staff to offer a broad program to all students. All the schools would be accessible – a very important goal.
 
Equalizing schools may reduce neighborhood house value inequities in the community. Increasing house values in the community means increasing revenue for the city. 
 
Having core facilities like libraries and gymnasiums on site increases the student/teacher instructional time. Adequately sized cafeterias also helps with maximizing the use of instructional time. Better technology will be available to all students.
 
It is a question of fairness.
 
Disadvantages and concerns
Achieving equity will be costly. Existing schools are very different. Achieving equity will take a long time to achieve. It is alsonearly impossible to completely measure “equity.” Equalizing opportunities to learn in the schools may require more staff.
 
More equity is possible with larger campuses. Land allows for future needs. Downtown schools have limitations. Three campuses at Beaver Meadow, Conant, and Broken Ground provide land for future needs
 
Other
Task Force members recommended that the Board evaluate the costs and needs of all the schools rather than just a couple. Taking action on only a limited number of schools does not take into consideration the costs, needs, flexibility and potential problems on the whole system.  
 
Some Task Force members recommended that the Board develop cost estimates for bringing all the buildings up to ADA and modern energy standards and for addressing other identified needs such as gymnasiums. Then we can directly compare the costs of renovating all schools vs. costs of closing and renovating and building new..
 
In addition, some Task Force members urged the Board to evaluate population projections, which predict growth in elementary school aged children to exceed what existed in 1995. Consider closing smaller schools temporarily, giving the district more time to complete the necessary ADA, energy and other improvements to those buildings so that they are ready when needed again in ten to fifteen years.
 
At the last Task Force II meeting on November 19, 2009, District Director of Facilities and Planning Matt Cashman and architect consultant Dan Cecil summarized the analysis of three options focusing on the west side and presenter three options: Option #1 was to continue to operate the four smaller schools at current levels of maintenance. Option #2 was to renovate all four smaller schools up to code. The development of Option #2 was specifically requested by Task Force II. Option #3 was the Four-Cluster Plan. Option #3 was actually the least expensive.
 
6.0   School Board Approves Consolidation Cluster Plan
At the December 2008 the School Board voted 8-1 with one nay vote (Bonk) to adopt the “Four-Cluster Plan” (Option #3), consolidation of Kimball/Walker Schools and Rumford/Conant Schools, with the eventual closing of Walker and Rumford for the consolidation of the elementary schools and authorized the administration to file necessary paperwork with the Department of Education. Members of the School Board each spoke about the reasons they were voting for the consolidation cluster plan.
 
 
 
 
 
 
 
 
 
 
 
 